Access Management operates throughout the Asia Pacific region and recently worked offshore in Vietnam where the teams carried out remedial blasting and painting.
|
|
|
|
The 5 tonne flare tip was installed on the Northern Endeavour. The Flare Tower is 92metres high and the installation of the flare tip was carried out without the use of a crane by utilising advanced rigging and rope access techniques.
|
|
|
|